Waiting for parts. Next installment should be in about 2 weeks.
These are the electrolytic caps that are being changed:
.
- A7r02453sml.jpg (108.49 KiB) Viewed 12505 times
- A7r02455sml.jpg (159.17 KiB) Viewed 12505 times
- A7r02456sml.jpg (105.94 KiB) Viewed 12505 times